Admin Bar
Home > Administration > General
General
In this file you will find all of the general administrative files and downloads for the 2010 school year.
Below are the files in General.
- KC Contract 2010 (161.7 KB)
This is copy of the full contract signed with the MoE on 22nd February 2010.
- KC Programme 2010 (53.8 KB)
This document is a copy of the programme as supplied to the MoE upon the signing of the 2010 Contract. It focuses on several areas. These being. What are the specific programme results that are planned? What are the planned programme activities? What is the scale and frequency of the programme activities? What resources will be needed to carry out the programme activities? What measures will be used to evaluate progress? What evaluation of the measures will be carried out?
- Phased Budget 2010 2012 (20.9 KB)
This document is the phased budget for KC as supplied to MoE in Feb 2010.
- KIWI Briefing Paper (357.4 KB)
The Aims of KIWI are as follows
1. Provide a Wireless Network and centralised PC to host the Kapiti Collaboration’s Learning Management System.
2. Provide direct links to KAREN for all participating schools.
3. Gain access to NEN (National Education Network Trial 2010 to 2011) which may give us access to a free pipe with unlimited width and speed. Uncapped Internet.
4. To distribute Ultra Fast Broad Band to all schools in the Kapiti Collaboration at cost effective price, until such time as the Government Broad Band Initiative provides a better Fibre Optic service.
- Kapiti ICT Wireless Initiative (KIWI) Memorandum of Risk (773 KB)
The Schools listed agree to share the financial risk as detailed for the establishment of the Kapiti ICT Wireless Initiative (KIWI)
Paraparaumu College, Kapiti College, St Patricks School Kapiti School, Paraparaumu School, Raumati Beach School, Raumati South School, Paraparaumu Beach School, Kenakena School, Kapanui School, Paekakariki School, and Waikanae School
- Draft KC 2010-2012 (112.6 KB)
Information for Principals.
- KIWI Costings (32 KB)
This file contains an update cost estimate by school and component for the installation of KIWI. All figures based on full participation by all 12 schools.
- Action Plan Template (78.5 KB)
A possible template upon which you could user to write your ICT PD Action Plan for 2010 as required in the Contract